Frontpage Slideshow | Copyright © 2006-2015 JoomlaWorks Ltd.
Capabilities2016

About Us

C. D. Perry & Sons, Inc. is highly experienced, multi-disciplined enterprise participating in the arena of heavy construction. The Company is proud to have provided nearly 80 years of safe, quality-assured services to a diverse client base. Founded in 1936 by Cutler D. Perry, the Company initially focused on the more challenging waterway projects. The Erie Canal System, the St. Lawrence Seaway, and numerous Niagara Mohawk Hydro Electric Stations were venues for both initial construction activities and/or refurbishment activities delivered on time through the collective talents of C.D. Perry & Sons.

Our talents lie within the following categories of construction:

• BRIDGES

• POWERHOUSES

• SITE PREPARATION

• RESERVOIR DREDGING, COFFERDAMING AND SHEET PILING

• INTAKES AND TRASH RACKS

• DAMS, DIKES AND WALLS

• SUBSTATIONS AND TRANSMISSIONS FACILITIES

• ROADS

• RIGGING AND EQUIPMENT SETIING

• DRILLING

• FOUNDATIONS

• GATES AND VALVES

• PENSTOCKS, POWER CANALS AND TAILRACES

C.D. Perry & Sons has established an impressive resume of work on the water-related assets at some of New York State's most well recognized locations. Wharf construction, reservoir dredging, construction of intakes and trash racks, cofferdaming and linear/cellular sheet piling are just a sampling of some of the recent accomplishments taking places at the following locations:

• Lock C-2 NYSThruway Authority $22 million

• Locks 10E, 11C, 12E NYSDept. of Transportation $20 million

• Port of Albany $13 million

• Lock 0-1 NYS Dept. ofTransportation $3 million

• Lock C-3 $1 million

Hydro electric power plants are also an area where the company's expertise is well utilized. A few examples of recent jobs completed at these power generation stations include:

• Dam rehabilitation for NYSEG $8 million

• Forebay reconstruction- Niagara Mohawk $3 million

• Reconstruct NIMO Ephratah Hydro Station $2 million

• Niagara Mohawk Spillway reface/ Traintor gate replacement $1 million

In addition to C.D. Perry's well-known reputation for high performance in the area of more challenging water-based construction sites, C.D. Perry's talents are equally effective on site projects:

• Empire Generating 800 MW Co-Gen site work $17 million

• International Paper Company Foundation $3 million

• Marcy Transmission Foundation Piling $2 million

• General Electric Foundation Piling $1 million

Bridge construction and rehabilitation has long been one of our key areas of expertise. Some of the larger jobs include:

• Freeman's Bridge Construction $8 million

• Ogdensburg Bridge $7 million

• Utica Bridge over the Mohawk $4 million

• Genesee St. Bridges and approach roads $2 million

• Chittenango Bridge $ 2million

The company is well versed in severe winter weather construction techniques and accelerated construction scheduling. We are also experienced with protective techniques that assure the continuance of electric power generation or other industrial process activities during construction.

The schedule of equipment owned by the Company is extensive. The following is a sampling of the employable assets available for immediate mobilization to job sites:

• Cranes

• Dozers

• Quadra float Barges

• Tug Boats

• Wheel loaders

• Trucks and trailers

• Excavators

• Air Compressors

• Tractors

• Welders and Light Plants

 
Copyright © 2017 C.D. Perry & Sons, Inc.. All Rights Reserved.
C.D. Perry & Sons, Inc. Foot of Monroe Street, P.O. Box 866, Troy, New York 12181, 518.272.0831 jryan@cdperryandsons.com